San Diego ADU permit requirements

Last reviewed: June 22, 2026

Quick answer

Permitting an accessory dwelling unit (ADU) in San Diego, California means pulling a building permit from the local authority that issues it. ArchPermit tracks 20 source-cited requirements (12 required, the rest conditional) for this jurisdiction. Submittals go through OpenDSD / Accela online permitting portal. These requirements were last reviewed June 22, 2026; confirm the exact forms and fees with the local permitting authority.

A source-cited checklist of what an ADU (accessory dwelling unit) permit package needs in City of San Diego. Every item links to its authoritative source; items that vary are flagged to confirm locally.

A building permit is always required to create an ADU or JADU — there are no exemptions — and review is ministerial (approved if the regulations are met). Under AB 1332, applying with pre-approved plans gets a 30-day review. The ADU Bonus Program (SDMC § 141.0302) allows additional bonus ADUs in exchange for deed-restricted affordable units. The detailed item-by-item submittal standard is the Project Submittal Manual (PSM) Section 2A for single-dwelling-unit projects.

  • Building Sectionsrequired

    Cross-sections showing framing, insulation R-values, floor/roof levels, and ceiling heights (PSM item 5.4).

    source · reviewed 2026-06-22
  • CALGreen Documentationrequired

    Notes/details showing California Green Building Standards (CALGreen) compliance (PSM item 4.18).

    source · reviewed 2026-06-22
  • Exterior Elevationsrequired

    All four exterior elevations (N/S/E/W) to scale, with grades, finished-floor elevations, building height, and materials (PSM item 5.2).

    source · reviewed 2026-06-22
  • Floor Plansrequired

    Plan of all floors showing room uses, dimensions, and doors/windows; existing and proposed (PSM item 5.1).

    source · reviewed 2026-06-22
  • General Application (DS-3032)required

    The Development Services permit application form (PSM item 1.0, General Application Package).

    source · reviewed 2026-06-22
  • Roof Planrequired

    Required for new construction or roof modification — slopes, ridges, drains, material, and screening (PSM item 5.3).

    source · reviewed 2026-06-22
  • Site Plan & Vicinity Maprequired

    Lot layout per IB 122 — property/setback lines, easements, structures, parking, drainage, utilities, impervious surface (PSM item 4.0, Site Plan Package).

    source · reviewed 2026-06-22
  • Storm Water Requirements Applicability Checklist (DS-560)required

    Must be completed and scanned onto the construction plans for all projects (PSM item 1.4).

    source · reviewed 2026-06-22
  • Structural Plans & Detailsrequired

    Foundation, framing, and connection details (PSM item 6.0, Structural Package).

    source · reviewed 2026-06-22
  • Title 24 / California Energy Code Documentationrequired

    Energy-compliance documentation (CF1R) per the California Energy Code (PSM item 9.0) — required even though full MEP plans are not.

    source · reviewed 2026-06-22
  • Title Sheet / General Notesrequired

    First-sheet table: scope of work, sheet index, project team, owner, legal description/APN, zoning, occupancy, FAR, and dwelling-unit summary (PSM item 3.1).

    source · reviewed 2026-06-22
  • Water Meter Data Card (DS-16)required

    Required for any project adding new plumbing fixtures; one card per new/modified meter (PSM item 1.1).

    source · reviewed 2026-06-22
  • Affordable Housing Requirements Checklist (DS-530)conditional

    Conditional — for residential projects of 10+ units (5+ in the Coastal Overlay Zone) or condo conversions; rarely triggered by a single ADU (PSM item 1.5).

    source · reviewed 2026-06-22
  • Best Management Practice (BMP) Planconditional

    Construction plus permanent/LID BMPs shown as a BMP sheet; triggered by storm-water/site conditions (PSM item 4.8).

    source · reviewed 2026-06-22
  • Coastal Development Permit (CDP)conditional

    Conditional — required for ADUs/JADUs in the Coastal Overlay Zone not fully contained in the existing structure, or adding/converting habitable area; some JADUs are exempt.

    source · reviewed 2026-06-22
  • Geotechnical Investigation / Soils Reportconditional

    Conditional based on site conditions / building-official determination (PSM matrix item 13.0).

    source · reviewed 2026-06-22
  • Junior Unit Agreement (DS-202A)conditional

    Required before permit issuance for a JADU only: a deed restriction that the primary and junior unit cannot be sold/conveyed separately and that the owner resides on-site.

    source · reviewed 2026-06-22
  • Landscape Construction Packageconditional

    Conditional — triggered by tree/landscape requirements (e.g. two or more ADUs require trees per lot area; PSM matrix item 7.0).

    source · reviewed 2026-06-22
  • Residential Fire Sprinkler System Plansconditional

    Required where the primary dwelling has or needs sprinklers (see Technical Bulletin RESD 3-4; PSM matrix item 12.0).

    source · reviewed 2026-06-22
  • Structural Calculations / Truss Calculationsconditional

    Structural calculations (PSM item 10.0) and truss plans/calcs (PSM item 11.0) — IB 400 marks these 'as applicable.'

    source · reviewed 2026-06-22