Minneapolis ADU permit requirements

Last reviewed: June 22, 2026

Quick answer

Permitting an accessory dwelling unit (ADU) in Minneapolis, Minnesota means pulling a building permit from the local authority that issues it. ArchPermit tracks 18 source-cited requirements (12 required, the rest conditional) for this jurisdiction. Submittals go through Minneapolis Development Review (ProjectDox). These requirements were last reviewed June 22, 2026; confirm the exact forms and fees with the local permitting authority.

A source-cited checklist of what an ADU (accessory dwelling unit) permit package needs in City of Minneapolis. Every item links to its authoritative source; items that vary are flagged to confirm locally.

ADUs are permitted citywide on any lot where single- or two-family homes are allowed (one ADU per lot). A build follows a two-track review: (1) an administrative zoning/land-use ADU application ($325), and (2) a construction building permit via ProjectDox reviewed by Construction Code Services, Zoning, and Public Works. Owner-occupancy applies to INTERNAL ADUs only: the owner must occupy one unit and record a covenant with Hennepin County before permit issuance; this does NOT apply to attached or detached ADUs.

  • ADU Application Worksheet & Accuracy Declarationrequired

    Completed zoning ADU application worksheet with signed accuracy declaration. This is the lead form of the administrative land-use application ($325 fee).

    source · reviewed 2026-06-22
  • Building / Wall Sectionrequired

    Cross-section from footing to ridge identifying all materials (waterproofing, insulation, vapor barrier, sheathing, plates, joists) with floor-to-ceiling heights per level.

    source · reviewed 2026-06-22
  • Building Permit Application (ProjectDox track)required

    Building-permit application that initiates the ProjectDox construction-review track, separate from the zoning ADU application.

    source · reviewed 2026-06-22
  • Energy Code Compliance Certificate / Worksheetrequired

    Minnesota energy-code compliance documentation submitted with the construction plan set.

    source · reviewed 2026-06-22
  • Foundation Planrequired

    All foundations/footings (size, location, thickness, materials, reinforcing) and embedded anchoring; dwellings require frost footings per IRC R403.

    source · reviewed 2026-06-22
  • Framing / Roof Framing Planrequired

    All structural members (joists, headers, posts, beams, rafters, trusses) with location, size, spacing, attachment, material, truss direction, and bearing points.

    source · reviewed 2026-06-22
  • Property Photos (all sides)required

    Photos of the property and all sides of the existing structure(s).

    source · reviewed 2026-06-22
  • Radon System Informationrequired

    Radon system installation information shown on the plans or as a separate attachment.

    source · reviewed 2026-06-22
  • Scaled, Dimensioned Elevations (each façade)required

    Elevation drawings of every façade of the ADU; detached ADUs must also show the existing/proposed principal dwelling.

    source · reviewed 2026-06-22
  • Scaled, Dimensioned Floor Plans (all floors)required

    Floor plans for all floors (¼-inch-per-foot scale or finer for the construction set) showing room names, door/window sizes/locations, and fire assemblies.

    source · reviewed 2026-06-22
  • Scaled, Dimensioned Site Planrequired

    Property lines, streets/alleys/curb cuts, building footprints & areas, parking, impervious surfaces, fences, mechanical equipment, landscaping, drainage direction, north arrow, and date. Prepared by a MN-licensed architect/landscape architect/engineer/surveyor.

    source · reviewed 2026-06-22
  • Signed Residential Construction Management Agreementrequired

    Signed City of Minneapolis Residential Construction Management Agreement form.

    source · reviewed 2026-06-22
  • Erosion Control Planconditional

    Required where more than 5,000 sf of dirt is disturbed (a Soil Erosion Permit Application is also required).

    source · reviewed 2026-06-22
  • Existing-Conditions Survey (MN-licensed surveyor)conditional

    Scaled, dimensioned survey signed by a MN-licensed surveyor showing address, property lines, spot elevations, and adjacent setbacks; required for a new detached structure or when wrecking an existing one.

    source · reviewed 2026-06-22
  • Owner Authorization Letterconditional

    A letter from the property owner authorizing the application, required only if the applicant is not the owner.

    source · reviewed 2026-06-22
  • Recorded Owner-Occupancy Covenant (internal ADUs only)conditional

    For internal ADUs only: a covenant recorded with the Hennepin County Recorder restricting owner-occupancy; proof of recording is required before building-permit issuance. Not required for attached or detached ADUs.

    source · reviewed 2026-06-22
  • Stormwater Management Planconditional

    Required where more than ½ acre of land is disturbed.

    source · reviewed 2026-06-22
  • Wrecking Permit + Demolition Notificationconditional

    If a structure must be removed, a wrecking permit (started before the building permit, by a licensed wrecking contractor) plus Notification of Pending Demolition letters to adjacent owners.

    source · reviewed 2026-06-22

Minneapolis ADU permit questions

Do I need a permit to build an ADU in Minneapolis?
Yes. An accessory dwelling unit (ADU) in Minneapolis requires a building permit. ArchPermit tracks 18 cited requirements for this jurisdiction (12 required, the rest conditional). Always confirm the exact forms, fees, and code edition with the local permitting authority that issues the permit.
What does an ADU permit package require in Minneapolis?
Core required items include: ADU Application Worksheet & Accuracy Declaration; Building / Wall Section; Building Permit Application (ProjectDox track); Energy Code Compliance Certificate / Worksheet; Foundation Plan; Framing / Roof Framing Plan, plus 6 more. Each requirement links to its authoritative source, and nothing is permit-ready until an independent licensed professional reviews and seals it.
How are ADU permits submitted in Minneapolis?
Minneapolis accepts permit submittals via Minneapolis Development Review (ProjectDox). ArchPermit prepares a draft package you can submit there after a licensed architect reviews and seals it.