Sioux Falls ADU permit requirements

Last reviewed: June 22, 2026

Quick answer

Permitting an accessory dwelling unit (ADU) in Sioux Falls, South Dakota means pulling a building permit from the local authority that issues it. ArchPermit tracks 13 source-cited requirements (12 required, the rest conditional) for this jurisdiction. Submittals go through Customer Self-Service (CSS) portal. These requirements were last reviewed June 22, 2026; confirm the exact forms and fees with the local permitting authority.

A source-cited checklist of what an ADU (accessory dwelling unit) permit package needs in City of Sioux Falls. Every item links to its authoritative source; items that vary are flagged to confirm locally.

A detached ADU is a 'Permitted Special' accessory use (by-right with standards, not a discretionary conditional use) in the detached-dwelling zoning forms DD1–DD4/DD7 (RT-1/RT-2, RHP, RR), NOT in DD5 (manufactured-home). Standards (§ 160.093): one of the two units must be owner-occupied; additional off-street parking is required; the ADU is ≤40% of the main structure's square footage, rear yard only, ≥10 ft from the main dwelling, and keeps the same required yards as the principal building. There is no standalone ADU permit — a detached ADU uses the standard Residential Plan Review submittal set plus the § 160.093 standards (a conditional use permit is the fallback only if the standards can't be met). Attached ADUs are listed only for DD1 (rural RR) — confirm allowance in other districts.

  • ADU Dimensional Compliance (size/location)required

    Plans must demonstrate ≤40% of the main structure, rear yard only, ≥10 ft from the main dwelling, and the same required yards (§ 160.093).

    source · reviewed 2026-06-22
  • Additional Off-Street Parking (shown on plans)required

    ADU-specific: one additional off-street parking space, as for an additional single-family dwelling (§§ 160.550 et seq.).

    source · reviewed 2026-06-22
  • Corner-Pin Grade Elevations + Minimum Ground Elevationrequired

    Grade elevations at the lot's corner pins and the minimum ground elevation (top of black dirt at the lowest exposed part), required by Engineering.

    source · reviewed 2026-06-22
  • Cross Sections & Framing Detailsrequired

    Wall sections with R-values, glazing U-factor, eave depths; attic ventilation; stair sections; deck/patio sections; fire-resistive assembly details.

    source · reviewed 2026-06-22
  • Exterior Elevationsrequired

    Must match the site/floor plans; finished-floor elevation, building height, covered/uncovered decks/patios/porches.

    source · reviewed 2026-06-22
  • Floor Plansrequired

    Must match the site plan; exterior dimensions, room-use labels, plumbing fixtures/floor drains, square footages by level, decks/patios, window wells, attic/crawl access, safety glazing, rated walls/doors.

    source · reviewed 2026-06-22
  • Foundation Planrequired

    Footings, spread footings, foundation walls, interior column pads, deck piers/footings, window wells, unexcavated/crawl spaces with access + ventilation.

    source · reviewed 2026-06-22
  • Owner-Occupancy Compliancerequiredverify locally

    One of the two units must be owner-occupied (§ 160.093); the code states the requirement but the exact documentation submitted at application is not specified — confirm the form with Planning.

    source · reviewed 2026-06-22
  • Residential Plan Review Application / New Construction Checklistrequired

    Fillable application (address, contractors, applicant/signature), submitted via CSS or at the counter.

    source · reviewed 2026-06-22
  • Roof Planrequired

    Roof drainage and slope.

    source · reviewed 2026-06-22
  • Site Planrequired

    Property lines + lot dimensions, north arrow, all structure footprints with exact distances to property lines, required setbacks, driveway/parking, easements, address + legal description.

    source · reviewed 2026-06-22
  • Sub-Permits (mechanical / electrical / plumbing)required

    Issued as sub-permits to the main building permit; final trade inspections required before a Certificate of Occupancy.

    source · reviewed 2026-06-22
  • Structural Engineering (with plans)conditional

    Required at submittal for pre-engineered buildings, core floor + supporting foundations, or appendages >200 sf on piers (stamped by a SD-licensed engineer).

    source · reviewed 2026-06-22